fbpx
Property in Alanya | +90 242 514 21 38

Works by the municipality of alanya in the city centre


Alanya Municipality has taken measures to renew the sidewalks and roads with completed infrastructure and asphalts that have reached the end of their useful lives. Engineering teams began cleaning and repair work to lay hot asphalt on roads and trails. Alanya Municipality has started the renewal of the roads, whose pavement and infrastructure works have been completed, and the asphalt, which has come to the end of its useful life throughout the district. The works, which will be carried out with 3 separate asphalt and road teams, will continue in Oba Mahallesi Hatipoğlu Street. As part of the work, the old asphalt will be removed and the streets and roads prepared for the new asphalt surface. “WE MAKE OUR ROADS MORE CONVENIENT” Alanya Mayor Adem Murat Yücel stated that the preparatory work before asphalting has started on Oba Mahallesi Hatipoğlu Street where the pavement and road arrangement have been completed, saying: “Our work will continued in Saray Mahallesi, Kale Road and other neighborhoods where required. Our teams work non-stop to provide our citizens with more convenient and safer roads. We will continue to devote all our resources to our citizens,” he said.