On March 17, 2017 the bridge was ceremoniously opened. In October 2015 construction work began. The new bridge is 191 meters long and ten meters wide. A total of forty separate ceilings were poured. In addition to a huge relief for the villagers in the vicinity of the Dim-barrage, which now have much shorter trips to Alanya, for example, another important aspect with the new bridge is likely to come into play.